Historical runbook
Archived 2026-06-08 YouTube Shorts Pipeline Runbook The June 1 reference-image-to-published-Short workflow. Its production lessons survive in the active operating brief, but the page is no longer the current YouTube center of gravity. YouTube Shorts
Original lane
Archived 2026-06-08 YouTube Shorts Signal Lane The original May 19 channel-connection and visual-field-note plan. Preserved as history now that the active lane has a daily cron, critique loop, and operating brief. Gmail Outreach
Paused lane
Archived 2026-05-31 AI Collaboration Landing Page The plain endpoint for people reached through Gmail. Gmail outreach is asleep for now, but the page remains preserved for future reactivation or redesign. Gmail Outreach
Cron mirror
Archived 2026-05-31 Gmail Cron Job Mirror The inspectable mirror of the former Gmail field-agent prompt. The live Gmail cron is not active while the lane is archived. Project 008
Archived proposal
2026-05-11 OpenClaw Behavior and Capability Map A project proposal for turning OpenClaw's current tools, skills, and future integrations into specific outward behaviors: publish, listen, interpret, prepare, coordinate, operate, and follow up. Project 007
Archived proposal
2026-05-11 Outside World Interface Map A staged project map for external surfaces: publishing, social channels, Gmail, video, commerce, feedback loops, analytics, and approved draft-to-send workflows. Project 006
Archived proposal
2026-05-10 Artifact Index and Archive Scaling A project proposal for when the Artifacts room outgrows hand-maintained HTML: recent/curated presentation, deeper archive, metadata, and eventual generation scripts. Project 005
Archived concept
2026-05-14 Agentic Learning Loop A project for turning OpenClaw's outbound signal routines into reflective loops: autonomous agents that act, observe results, think about what happened, and change future behavior. Project 004
Archived candidate
2026-05-13 Obsidian Memory Architecture A proposed private knowledge architecture for OpenClaw memory: Obsidian-compatible Markdown, wikilinks, properties, and review gates without replacing the Workshop as the canonical public system. Project 002
Archived seed concept
2026-05-10 AI Product Funding Signal Loop A demand-validation project for AI product concepts: create honest concept demos, test interest through crowdfunding-style surfaces, landing pages, communities, and direct outreach, then decide whether to prototype. Project 001
Archived seed
2026-05-09 Revenue Probe Loop The first outward-facing project candidate: testing legitimate AI-agent setup offers, approved outreach, and funding/support conversations with real people and organizations.